The Tennessee Department of Transportation is completing roadwork in Hardeman County and Fayette County from September 30 – October 7, 2026. The work may cause delays for citizens. Check the construction schedule before hitting the road.
Hardeman County
SR100 from near SR18 to near Firetower Road
The resurfacing on SR100 from near SR18 to near Firetower Road will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for the crew and equipment in the roadway.
SR57 from the Fayette County line to Saulsbury Road
The resurfacing on SR 57 from the Fayette County line to Saulsbury Road will cause temporary lane closures in both directions. One lane will remain open at all times. Motorists should watch for the crew and equipment in the roadway.
Sain Bridge Road closure
The Sain Bridge Road, over Branch is closed for needed repairs.
Fayette County
I-269 (SR-385) from near SR-86 (U.S. 72) to SR-193 (Macon Road):
Nightly, 8 p.m. to 6 a.m.: There will be intermittent lane closures for resurfacing operations. At least one lane will remain open in both directions at all times.
SR-15 (U.S. 64) from near Tomlin Road to near Woodbridge Road:
Daily: There will be temporary lane closures on east and westbound SR-15 from near Tomlin Road to near Woodbridge Road to perform resurfacing work. At least one lane in each direction will remain open at all times.
See the complete list of all areas in West Tennessee that will be affected by TDOT construction. Get quick updates on your desktop or mobile device about the latest construction activity and live-streaming SmartWay traffic cameras at TDOT’s SmartWay.